Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project

Agency:
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159825789739666
Posted Date: Mar 15, 2024
Due Date: Mar 31, 2024
Source: https://sam.gov/opp/4651985665...
Follow
Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project
Active
Contract Opportunity
Notice ID
W912DS24B0008
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NAD
Office
W2SD ENDIST NEW YORK
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 15, 2024 11:25 am EDT
  • Original Response Date: Mar 31, 2024 02:00 pm EDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Apr 15, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1KF - CONSTRUCTION OF DREDGING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Highlands , NJ
    USA
Description

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York Harbor, Sandy Hook Federal Channel. The dredged material would be placed for future beneficial use the Sea Bright Offshore Borrow Area (SBOBA), approximately 5 miles southeast of Sandy Hook Point, NJ; and/or at a nearshore placement site(s). The proposed maintenance dredging would remove approximately 200,000 cubic yards of dredged material from Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand and gravel.





The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.





Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.





The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all work ready for use not later than ninety (90) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.





The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2024, with bid opening in July 2024. It is the intention of the government to award in August 2024 and issue the NTP within fourteen (14) calendar days of the award date.





Liquidated Damages of $2,789.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.





This is an unrestricted Procurement.




Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300
  • NEW YORK , NY 10278-0004
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 15, 2024 11:25 am EDTPresolicitation (Original)