Y1DZ--NRM - CON - 561A4-18-101 Replace Central Chillers -Construction
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159197422967770 |
Posted Date: | Mar 7, 2024 |
Due Date: | Aug 30, 2023 |
Source: | https://sam.gov/opp/6725c1b6fe... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Updated Published Date: Mar 07, 2024 07:50 am EST
- Original Published Date: Jul 13, 2023 07:22 am EDT
- Updated Date Offers Due: Aug 30, 2023 10:45 am EDT
- Original Date Offers Due: Aug 23, 2023 10:45 am EDT
- Inactive Policy: Manual
- Updated Inactive Date: Mar 10, 2024
- Original Inactive Date: Nov 21, 2023
-
Initiative:
- None
- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: Y1DZ - CONSTRUCTION OF OTHER HOSPITAL BUILDINGS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
151 Knollcroft Rd Lyons, NJ 07939 ,USA
1 - Amendment it to provide Addendum 2 from AE as follows:
Reference key note #1 on drawing 136-MH-101:
Revise Construction Key Note #1 to read:
Provide new Refrigerant gas leak detection system to replace existing.
New system shall be Genesis International`, Inc. Sherlock 802 with Optional Strobe Refrigerant gas leak an Monitoring and alarming system (SHER802-S). Provide Two Sensors per Chiller for 3 chillers. For a total of 6. Plus, Provide one additional Oxygen Depletion Sensor. Install per manufactures recommendations below new and existing chillers. Connect to existing BAS system. Remove existing system.
Equipment shall be or as approved equal. See attached data sheet for further information.
2 - Additional correction regarding amendment posted 08/17/2023, the correct pump schedule is as follows:
On Drawing 136-MH-701 - Pump Schedule Circulating Fluid Head (FT):
P-4 Revise - Head (FT): from 25 to 60 FT.
P-5 Revise - Head (FT): from 35 to 60 FT.
P-6 Revise - Head (FT): from 35 to 60 FT.
P-8 Revise - Head (FT): from 55 to 92 FT.
P-9 Revise - Head (FT): from 50 to 100 FT.
- 113 HOLLAND AVE
- ALBANY , NY 12208
- USA
- Contracting Officer
- victoria.clark6@va.gov
- Phone Number 585-393-8228
- Mar 07, 2024 07:51 am EST Award Notice (Original)
- Mar 07, 2024 07:50 am ESTCombined Synopsis/Solicitation (Updated)
- Nov 28, 2023 11:55 pm EST Combined Synopsis/Solicitation (Updated)
- Aug 17, 2023 02:55 pm EDT Combined Synopsis/Solicitation (Updated)
- Aug 14, 2023 11:07 am EDT Combined Synopsis/Solicitation (Updated)
- Aug 08, 2023 08:46 am EDT Combined Synopsis/Solicitation (Updated)
- Jul 13, 2023 07:22 am EDT Combined Synopsis/Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.